In 2020, the Dane Bank Green Space organisation was formally registered as a charity (Reg: 1189904). This allowed the Charity to successfully apply to the Big Lottery and Postcode Lottery for grants to open up and develop a former horse grazing field that had been closed to local residents for over 50 years.
From the outset, progress was severely constrained by the Covid lockdown and ongoing National Emergency but the following key milestones were achieved over the next two years:
2021
March |
Ground investigation and topographic surveys completed |
May |
Planning permission granted in outline for Phase 1 site improvements |
July |
Site Lease (25 years) and Site Licence sealed by Tameside Council |
December |
Appointment of preferred contractor (Groundwork Landscapes Limited) |
2022
January |
Detailed approval of planning application conditions including creation of two swales to improve surface water run-off and drainage |
May |
Commencement of Phase 1 site improvement works including circulatory footpath |
June |
Completion of Phase 1 site improvement works |
July |
Installation of two signboards funded by Manchester Airport |
December |
Installation of Swing Gate funded by GM High Sheriff’s Police Trust |