Phase 1

In 2020, the Dane Bank Green Space organisation was formally registered as a charity (Reg: 1189904). This allowed the Charity to successfully apply to the Big Lottery and Postcode Lottery for grants to open up and develop a former horse grazing field that had been closed to local residents for over 50 years. 

From the outset, progress was severely constrained by the Covid lockdown and ongoing National Emergency but the following key milestones were achieved over the next two years:

 

2021

March

Ground investigation and topographic surveys completed

May

Planning permission granted in outline for Phase 1 site improvements

July

Site Lease (25 years) and Site Licence sealed by Tameside Council

December

Appointment of preferred contractor (Groundwork Landscapes Limited)

 

2022

January

Detailed approval of planning application conditions including creation of two swales to improve surface water run-off and drainage

May

Commencement of Phase 1 site improvement works including circulatory footpath

June

Completion of Phase 1 site improvement works

July

Installation of two signboards funded by Manchester Airport

December

Installation of Swing Gate funded by GM High Sheriff’s Police Trust